Almaty · electrical work
Flawless energy.
Rough and finish wiring, CCTV and smart home. We do the install ourselves, from the cable run to labelled circuits.
QF1 · incomer · illustration
Matrix
Three lines, side by side
What each job actually includes.
01
Wiring
Rough and finish
- What we do
- Cable, routes, sockets, lights and the board
- When
- During rough-in and at finish
- Who installs
- Us
- What you keep
- Labelled circuits and a diagram
02
CCTV
We install it ourselves
- What we do
- Cameras, recorder, power and cable
- When
- Alongside the wiring
- Who installs
- Us
- What you keep
- A view that is actually set
03
Smart home
While the walls are open
- What we do
- Light, climate, blinds and scenes
- When
- Designed into the rough-in
- Who installs
- Us
- What you keep
- Scenes you can live with
Four stages
From the visit to the diagram we leave behind.
- 01
Visit
We come, look and listen. We note what is already there.
- 02
Estimate
The list of work and materials, before anyone starts, line by line.
- 03
Install
To the diagram: routes, boxes, labelled circuits, a board you can read.
- 04
Handover
We show what goes where. We leave the diagram.
Before and after
A board you can read.
A drawing, not a photo of a job.
Illustration. Not a photo of a job.
Reels
Short films from the jobs.
We add them as they are filmed. An empty frame is not a borrowed video.
Розетка искрит, когда вставляешь вилку. Это нормально?
Что будет, если схватить провод под напряжением?
Projects
Room for photographs.
We will not hang someone else’s pictures. These frames are waiting for ours.
Contact
Ready to start?
Almaty. WhatsApp is the easiest way.
What to send
So the conversation starts on the job, not on guesses.
- 01Address
- 02New build or renovation
- 03Rough or finish
- 04A photo of the board, if there is one